Cutover · 6 min read

Create and manage a go-live checklist

Connect tasks, time windows, responsibilities and dependencies around cutover in a manageable checklist.

Context

The critical transition into operations

Go-live is the most critical point in many SAP projects. A structured checklist helps capture tasks, assign accountability, track progress and respond to issues.

Working frame

Typical areas

  • Pre-go-live – T−7 to T−1
  • Cutover weekend – T0
  • Post-go-live and hypercare – T+1 to T+14

Step by step

From starting point to a structured flow

  1. Open the cutover area

    Navigate to the project’s cutover area.

  2. Set up the checklist

    Choose a prepared go-live checklist or create a new one.

  3. Add tasks

    Capture every task with its time window and accountable person.

  4. Connect dependencies

    Link dependent activities in the required order.

  5. Generate the runbook

    Provide the checklist as a detailed runbook for the cutover team.

From practice

Implementation notes

  • Run a cutover rehearsal before the live event.
  • Define clear rollback criteria and procedures.
  • Plan sufficient contingency.
  • Make escalation paths transparent to all participants.